Automation fasteners
DIN / ISO hardware, T-nuts, locating pins and assembly essentials.
- Hex bolts & socket caps
- T-slot nuts & profiles
- Dowel & locating pins
- Washers, retaining rings
The dependable source for the parts behind automation, machinery and solar infrastructure — specified, inspected and shipped on your terms.
Every family is documented against recognised standards, with material, finish and tolerance declared up front — so your engineering review starts from facts, not guesswork.
DIN / ISO hardware, T-nuts, locating pins and assembly essentials.
Timing belts, pulleys, couplings, bearing housings and more.
Matched motion, from compact gear motors to industrial drive systems.
Clean, reliable air prep, control and actuation components.
Profiles, brackets, feet, handles and the details that finish a frame.
From drawing to delivery. Small runs, tight tolerances, no drama.
A complete accessory range for rooftop and ground-mount PV structures.
A single accountable partner from drawing review to export packing. Each stage has an owner, a record and a checkpoint.
| Process | Standard tolerance | Achievable | Typical lead time |
|---|---|---|---|
| CNC milling (3–5 axis) | ± 0.05 mm | ± 0.01 mm | 7 – 15 days |
| CNC turning | ± 0.05 mm | ± 0.01 mm | 7 – 15 days |
| Laser cutting | ± 0.20 mm | ± 0.10 mm | 5 – 10 days |
| Sheet-metal bending | ± 0.50 mm | ± 0.20 mm | 5 – 12 days |
| Anodising / plating | Per specification | Per specification | +3 – 5 days |
Production is carried out by vetted partner facilities under JINXI supply-chain management. Facility names, locations and audit reports are disclosed on request under NDA.
Traceable lots, calibrated equipment and documentation that clears customs and internal audits without a second email.
Raw material certificates and dimensional spot-checks before a batch is released to the floor.
First-article approval plus patrol inspection at defined intervals, recorded against the work order.
Dimensional report, surface and functional checks against your drawing revision.
Every carton carries a lot code linking back to material, machine and operator records.
Inspection is performed at the partner facility before shipment. An optional third-party pre-shipment inspection (SGS / TÜV / Bureau Veritas) can be arranged at the buyer cost.
MOQ, samples, Incoterms, payment and warranty — written up front so engineering and purchasing can decide without a second call.
Typical MOQ 100 pcs for catalogue fasteners. Custom CNC / sheet-metal samples 1–5 pcs. Sample, tooling and freight are charged unless the quotation says otherwise.
Standard parts 7–15 working days after confirmation; custom parts follow the process table. Default Incoterms: FCA Foshan or DAP named place. No EU warehouse yet.
T/T, 30% deposit / 70% before shipment on a first order. L/C may be considered after a track record. Title remains with the seller until paid in full.
Inspect on arrival; obvious defects within 7 days. 12-month workmanship / material window for B2B lots, excluding wear, misuse or post-order spec changes.
Application context shapes the specification. Tell us the machine, the duty cycle and the environment — we will match the component to it.
Conveyors, gantries, pick-and-place cells and assembly lines running two or three shifts a day.
Wash-down environments, food-contact materials and fast changeover requirements.
Rooftop and ground-mount structures needing 25-year corrosion performance and clean documentation.
Compact, light and repeatable — motion components for mobile platforms and collaborative arms.
Downloadable, engineering-grade content — no gated fluff, no sales calls required.
Native and neutral formats for the seven product families.
Browse PDFSizing tables, material data and tolerance guidance in one document.
Download WhitepaperCost drivers, tolerance economics and how to brief a supplier well.
Read ComplianceRoHS, REACH and GPSR statements for customs and marketplaces.
DownloadA drawing, a photo or a part number is enough to start. You get a spec-checked quotation, not a placeholder price.
Under Regulation (EU) 2023/988 on general product safety (GPSR), products placed on the EU market must identify the manufacturer and, where the manufacturer is established outside the EU, an EU-based responsible person.
Named per order. The manufacturing partner is disclosed on the order confirmation and on the packing documents.
To be appointed before the first shipment to the EU. Contact us for the current status.
Safety information, warnings and instructions for use are provided in the official language of the destination country. RoHS, REACH and material declarations are available per line item.
A selection of RFQ-ready industrial components. The full catalogue lists all 30 product pages.