Solar Support Strut — 41 Series white-background product visual
Solar mounting accessories / JX-SOL-STR-41

Solar Support Strut — 41 Series

Structural strut profiles for rooftop PV support frames, selected by section, coating and load requirement.

SKUJX-SOL-STR-41
MaterialHot-dip galvanised steel / Zn-Al-Mg S340 or S350GD / aluminium
FinishHot-dip galvanised / Zn-Al-Mg coated / mill finish
Size41 × 21 / 41 × 41 / 41 × 52 / 41 × 62 / 41 × 72 mm · 1.4–2.5 mm
Typical MOQBy configuration
Typical lead time12–20 working days

These are RFQ-ready reference SKUs. Final revision, compliance documents and commercial terms are confirmed per order.

Technical specification

section41 × 21 / 41 × 41 / 41 × 52 / 41 × 62 / 41 × 72 mm
thickness_hdg1.4–2.5 mm (hot-dip galvanised)
thickness_zn_al_mg1.4–2.0 mm (Zn-Al-Mg)
coatingHDG; Zn-Al-Mg S340 (80 g/m²) / S350GD (275 g/m²); aluminium alloy 6005/6063
usePV support frame

Procurement reference

This section is a purchasing reference, not a declaration of conformity. Final revision, documents, project responsibility and commercial terms are confirmed per order.

Technical data statusA - Source-referenced section/coating data; final profile and revision confirmed per order
Drawing statusNo public controlled drawing; section, thickness and coating are selected per order
Typical applicationPV rooftop support frames and strut structures
Inspection scopeSection, wall thickness, coating designation and cut length checked against approved order specification
Packaging and labellingProfiles bundled and protected for export; bundle length and cut plan confirmed by quotation
Compliance boundaryStructural design, load and project responsibility are not established by catalogue data and must be confirmed per project.

Document pack available for review

  • Section/coating configuration sheet
  • Material/coating evidence when agreed
  • Inspection record when agreed

Information to include in your RFQ

  • Section 41 series variant
  • Thickness and coating
  • Cut length
  • Project design/load responsibility and destination

Product facts

The following points are stated so this page can be cited accurately.

Frequently asked questions

What are the typical MOQ and lead time for Solar Support Strut — 41 Series?

The JINXI catalogue lists By configuration and 12–20 working days for JX-SOL-STR-41. These are typical values; the final MOQ and delivery date are confirmed when we quote your order.

Are the drawings for Solar Support Strut — 41 Series manufacturing-ready?

No reference drawing is published for this SKU; geometry and tolerances are confirmed per order.

Which standards and compliance documents apply to Solar Support Strut — 41 Series?

Compliance documents such as material certificates, test reports and declarations of conformity are prepared and confirmed per order. Tell us which documents your project or market requires when you request a quote.

How do I request a quote and what are the commercial terms?

Use the “Request a quote” button on this page with your required quantity and destination. Default Incoterms are FCA Foshan or DAP named place. Payment is T/T, 30% deposit / 70% before shipment on a first order, with L/C possible after a track record.

What material and finish does Solar Support Strut — 41 Series use, and where are the full dimensions?

Hot-dip galvanised steel / Zn-Al-Mg S340 or S350GD / aluminium, with a Hot-dip galvanised / Zn-Al-Mg coated / mill finish finish. Full dimensions are listed in the technical specification table above; the complete specification is confirmed at order.